New Pyramids - Moncton, NB, Canada

To estimate the cost of building the first pyramid in Moncton to feed New Brunswick, Canada, let's break down the primary components and costs involved in constructing an autonomous vertical organic aeroponic garden using hemp-derived materials.


### 1. Land Acquisition

- **Cost:** Depends on location and size. For an urban area in Moncton, assuming a required land size of 10 acres, the cost might range from CAD 500,000 to CAD 2,000,000.


### 2. Design and Planning

- **Cost:** Architectural design, engineering, and planning fees might range from CAD 1,000,000 to CAD 5,000,000.


### 3. Construction Materials

- **Hemp-Derived Carbon Nanosheet Composites (HDCNS):** High-tech materials may have substantial costs.

- **Hempcrete and Hemp Plastics:** Cheaper than traditional materials but still substantial for large structures.

- **Estimated Cost:** CAD 50,000,000 to CAD 150,000,000 for materials.


### 4. Construction Labor

- **Cost:** Depending on the size and complexity, labor costs can vary.

- **Estimated Cost:** CAD 30,000,000 to CAD 100,000,000.


### 5. Vertical Farming Equipment

- **Aeroponic Systems:** Specialized equipment for vertical farming.

- **Lighting, Irrigation, and Control Systems:**

- **Estimated Cost:** CAD 20,000,000 to CAD 50,000,000.


### 6. Renewable Energy Systems

- **Solar Panels and Battery Storage:** To make the structure self-sufficient in energy.

- **Wind Turbines:** Additional renewable energy sources.

- **Estimated Cost:** CAD 10,000,000 to CAD 30,000,000.


### 7. Operational Costs (First Year)

- **Labor, Maintenance, and Utilities:** Estimated for the first year of operation.

- **Estimated Cost:** CAD 5,000,000 to CAD 15,000,000.


### 8. Contingency and Permits

- **Contingency Fund:** For unforeseen expenses.

- **Permits and Legal Fees:**

- **Estimated Cost:** CAD 10,000,000 to CAD 20,000,000.


### Total Estimated Cost:

Combining all these estimates, the total cost might range between CAD 126,500,000 to CAD 372,000,000.


### Cost Breakdown Summary:

- **Land Acquisition:** CAD 500,000 - CAD 2,000,000

- **Design and Planning:** CAD 1,000,000 - CAD 5,000,000

- **Construction Materials:** CAD 50,000,000 - CAD 150,000,000

- **Construction Labor:** CAD 30,000,000 - CAD 100,000,000

- **Vertical Farming Equipment:** CAD 20,000,000 - CAD 50,000,000

- **Renewable Energy Systems:** CAD 10,000,000 - CAD 30,000,000

- **Operational Costs (First Year):** CAD 5,000,000 - CAD 15,000,000

- **Contingency and Permits:** CAD 10,000,000 - CAD 20,000,000


These estimates are approximate and subject to variations based on actual project specifics, technological advances, and market conditions. Detailed feasibility studies and project planning would provide more accurate figures.



*****
**Marie Seshat Landry**
* CEO / OSINT Spymaster
* Marie Landry's Spy Shop
* Email: marielandryceo@gmail.com
* Website: www.marielandryceo.com

No comments:

Post a Comment


Blog Archive

Warning - Disclaimer

WARNING: **Disclaimer:** This blog is for informational and educational purposes only and does not promote illegal or unethical espionage. The author is a researcher who analyzes publicly available information for her own clients and the public. The views expressed are the author's own and do not reflect any organization or government. The author makes no guarantees about the accuracy or completeness of the information provided. Reliance on the information is at your own risk. The author is not liable for any loss or damage resulting from the use of the information. The author reserves the right to modify or delete content without notice. By using this open source intelligence (OSINT) blog, you agree to these terms. If you disagree, please do not use this blog. -Marie Seshat Landry

Pixel